TODI Indoor diving centre be-MINE Beringen

Reconstruction of an existing building into an indoor diving centre at the site of be-MINE at Beringen (in joint venture - in construction team).

Client: be-MINE Beringen
Architect: Eiland 7 Architecten Heverlee
Period: 2016